
Congestion Management Process and Long-Range Planning
Looking to the future: Congestion Management and the Long-Range Transportation Plan
For the proposed long-range plan, Plan It 2035, the regional travel demand model was used to determine how much congestion we expect with existing and committed (E&C) projects, as well as what is expected in the future based on projects in the long-range plan's preferred alternative. The E&C network represents projects currently built plus projects scheduled for construction by calendar year 2015.
The next two figures show maps of the congested roadways for the E&C Network and the long-range plan preferred alternative projects. Congested areas are highlighted on the maps.
|
Congested roadways in 2035 |
Congested roadways in 2035 |
Note: Click on image to view larger scale pdf format
For a more detailed description of the long range plan, check out the Long range transportation planning page.
For more information:
Bala Akundi, bakundi@baltometro.org or 410-732-0500 x1019.
Links within this web site:
Travel Demand Model
Aerial Surveys
Links to other web sites:
Last Updated on Friday, 04 November 2011 15:27


