Looking to the future: Congestion Management and the Long-Range Transportation Plan
For the proposed long-range plan, Plan It 2035, the regional travel demand model was used to determine how much congestion we expect with existing and committed (E&C) projects, as well as what is expected in the future based on projects in the long-range plan's preferred alternative.  The E&C network represents projects currently built plus projects scheduled for construction by calendar year 2015.

The next two figures show maps of the congested roadways for the E&C Network and the long-range plan preferred alternative projects. Congested areas are highlighted on the maps.

 2035 Existing & Committed

Congested roadways in 2035
Existing & Committed Projects

 Plan It 2035 - Preferred Alternative Congested Roadways

Congested roadways in 2035
Plan It 2035 Preferred Alternative

Note: Click on image to view larger scale pdf format

For a more detailed description of the long range plan, check out the Long range transportation planning page.

For more information:
Bala Akundi, bakundi@baltometro.org or 410-732-0500 x1019.


Links within this web site:

Travel Demand Model

Aerial Surveys


Links to other web sites:

Get Adobe Reader for pdf documents

Joomla SEF URLs by Artio